Owner:L¡¯Oreal
Owner:L¡¯Oreal(china)Co.,Ltd Project Location: Jinqiang

Industrial Development Zone, Pudong district, Shanghai

According to the tender documents, this project includes the

following items: A. Evaluation Building, B. Laboratory Buliding

C. Auxiliary Power House, S. Reagent Storage Room, G

. Guardhouse, P. Parking area, Fence and piping work

(Rainwater drainage and sewage system).

  
 
 
 
 
Caterpillar

The new facility project of comprises factory plant, power house, warehouse, guardhouse, testing house, bicycle shelter and outdoor work etc. The project with a total area 221037.1m2 and the total architecture area is 72913m2. Followings are the details:

  
 
 
 
 
 
Federal-Mogul Corporation HQ&Technical Center
Concordia International School Shanghai Phase 3 has an area of 26572.7 m2. It locates at his project is located at 999 Ming Yue Road, Jingqiao PuDong, Shanghai, China, within the area of Concordia International School Shanghai campus
  
 
 
 
 
 
Jiaxing ICL Chemical New Plant
Total area around 76925m2 with Phase ¢ñ 14500m2£¬including Office, Canteen, Bathroom, Lab and Central Control Room.
  
 
 
 
 
 
TUNG PEI INDUSTRIAL CO., LTD Phase ¢ò
The engineering includes process workshop, HUB, finished products warehouse and material house. It¡¯s of pile foundation and mainly steel structure.1.2m below of external wall lays minitype shallow concrete block and above is 50 thick cladding coreboard.
  
 
 
 
 
Kunjie Electrics plant
Kunjie Electrics plant engineering takes +3.000m in Wusong Elevation as ¡À0.000.Main body of the plant is 118.3m long and 64.3 wide with concrete column and steel roof. It is a 2-floor building and 3-floor in local with 16.3M high eave
  
 
 
 
 
 
Mirle Automation Corporation
The new plant¡¯s M&E Engineering of Mirle Automation Corporation, Shanghai owns to Mirle Automation Corporation, Shanghai.Construction Area: 10994m2 divided into 9694m2 above and 1300m2 under ground ,Building Area: 95,000 square meter.
  
 
 
 
 
 
Eternal Chemical
The engineering includes Office Building, UV Workshop, Utility Building, Group-A Storage House and Gate Rooms with a total cover 8716.98©O
  
 
 
 
 
 
RT-Mart, Cixi
Total area around 49829m2; 36989 m2 3-floor overground, 12840 m2 1-floor underground and 21700m2 foundation area; 21.20m high.
  
 
 
 
 
 
Wacker CSP Project
In this project, it contains Substation, Compressor & FF Pump Station, FF Tank, CCR, Chemical dosing station, Metering station, Dryer etc.
Work to be bid£ºFoundation and up up-structure
  
 
 
 
 
 
 
 