| Taicang Xinwang Energy Co., Ltd. Expansion Project |
Steel structure, Floor Area:4,650 sqm
Starting Date: May 2010
Completion Date: July 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Wanvog Furniture (Kunshan) Plant, Building 6 |
Frame structure, Floor Area:38,500 sqm
Starting Date: April 2010
Completion Date: November 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Carpoly Paint (Shanghai) New Plant |
Frame structure, Floor Area:28,318 sqm
Starting Date: March 2010
Completion Date: August 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Manuli Hydraulic Equipment (Suzhou) Co., Ltd. ,Phase VII |
Frame structure, Floor Area:6,344 sqm
Starting Date: January 2010
Completion Date: June 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Synnex Technology International (Hangzhou) Electronics Plant |
Frame structure, Floor Area:10,087 sqm
Starting Date: December 2009
Completion Date: August 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| No. 1 Workshop for Thick Double-sided Adhesive Project in Jinshan Factory |
Frame structure, Floor Area:3,452 sqm
Starting Date: December 2009
Completion Date: August 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| General Mills (Sanhe) Co., Ltd., Phase 1 |
Steel structure/Frame structure, Floor Area:6,920 sqm
Starting Date: December 2009
Completion Date: August 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Tenwow (Fujian) Food Project, Building 1-4 |
Frame structure, Floor Area:35,000 sqm
Starting Date: December 2009
Completion Date: July 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Sulzer Pumps Suzhou New Factory Project |
RC structure/Steel structure, Floor Area:22,570 sqm
Starting Date: December 2009
Completion Date: July 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Rich Products Suzhou Co., Ltd. Phase II |
RC structure£¬ Floor Area:7,422 sqm
Starting Date: August 2009
Completion Date: December 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Kailai Apartment
|
Frame structure£¬ Floor Area:160,000 sqm
Starting Date: June 2009
Completion Date: December 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Wharf (Holdings) Limited-Times Plaza Block B |
Frame structure£¬ Floor Area:140,000 sqm
Starting Date: March 2009
Completion Date: December 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Yujun (Weifang) New Plant Project |
Steel structure/Frame structure, Floor Area:23,500 sqm
Starting Date: March 2009
Completion Date: November 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Combined Factory Building of IPAGSA Printing Equipment(JX) Co., Ltd. |
Steel structure/Frame structure, Floor Area:15,527 sqm
Starting Date: March 2009
Completion Date: December 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Pilot¡¯s Cabin Production and Assembly Project |
RC structure£¬ Floor Area:36,892 sqm
Starting Date: February 2009
Completion Date: October 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shengneng Technology (Suzhou) Plant, Phase 1 |
Light Steel structure, Floor Area:4,550 sqm
Starting Date: November 2008
Completion Date: August 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Brintons Carpet Manufacturing (Suzhou) New Plant |
Steel structure/Frame structure, Floor Area:23,845 sqm
Starting Date: October 2008
Completion Date: April 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Haimen Doctor Garden |
Frame structure£¬ Floor Area:105,000 sqm
Starting Date: August 2008
Completion Date: December 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Xinxiang General Oxygen-free Copper Products Factory |
Steel structure/RC structure£¬ Floor Area:22,000 sqm
Starting Date: August 2008
Completion Date: August 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Caterpillar (Suzhou) Project
|
Steel structure,Frame structure, Floor Area:72,913 sqm
Starting Date: June 2008
Completion Date: April 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| RT-Market (Zhejiang) Cixi Market
|
Frame structure, Floor Area:49,829 sqm
Starting Date: June 2008
Completion Date: March 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Trina Solar (Changzhou) Project |
Frame structure, Floor Area:32,252 sqm
Starting Date: May 2008
Completion Date: May 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| The Civil Project For Building A And B Of L¡¯Or¨¦al (China) R&D Centre Project |
Frame structure, Floor Area:15,000 sqm
Starting Date: April 2008
Completion Date: July 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Jiaxing ICL Co., Ltd., New Plant |
Frame structure, Floor Area:14,000 sqm
Starting Date: April 2008
Completion Date: April 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Wacker Polymer System (Nanjing) Co., Ltd. |
Frame structure, Floor Area:11,000 sqm
Starting Date: April 2008
Completion Date: January 2009 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Federal-Mogul Corporation HQ & Technical Center
|
RC structure/Steel structure, Floor Area:8,874 sqm
Starting Date: April 2008
Completion Date: November 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shanghai-Hong Kong New World Garden |
Frame structure, Floor Area:16,000 sqm
Starting Date: March 2008
Completion Date: October 2010 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Taiwan Chuangxing Precision Chemistry Co., Ltd. |
Steel structure, Floor Area:11,586 sqm
Starting Date: January 2008
Completion Date: July 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Kunjie Electronics (Kunshan) Plant
|
RC structure/Steel structure, Floor Area:14,090 sqm
Starting Date: November 2007
Completion Date: June 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Taiwan Dongpei Industry Co., Ltd. |
Steel structure, Floor Area:24,099 sqm
Starting Date: November 2007
Completion Date: May 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Spring Of Shanghai |
Frame structure£¬ Floor Area:65,725 sqm
Starting Date: August 2007
Completion Date: August 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shanghai Mengli Automatic Technology Co., Ltd. |
RC structure/Steel structure, Floor Area:11,024 sqm
Starting Date: July 2007
Completion Date: June 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| BATZ Automotive Systems (Kunshan) New Plant
|
Frame structure, Floor Area:5,254 sqm
Starting Date: July 2007
Completion Date: March 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Fagor Catering (Kunshan) New Factory |
Steel structure/Frame structure, Floor Area:9,170 sqm
Starting Date: June 2007
Completion Date: April 2008 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Chiyoda Integre (Suzhou) Co., Ltd., Expansion Project |
RC structure£¬ Floor Area:5,000 sqm
Starting Date: January 2007
Completion Date: September 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Tokico Automotive (Suzhou) Co., Ltd. Expansion project |
RC structure/Steel structure, Floor Area:12,000 sqm
Starting Date: December 2006
Completion Date: May 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| RT-Market (Shanghai) Logistic Center Warehouse |
Frame structure,, Floor Area:16,289 sqm
Starting Date: November 2006
Completion Date: July 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Hyundai Shanghai Plaza |
Frame structure£¬ Floor Area:69,600 sqm
Starting Date: August 2006
Completion Date: June 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Concordia International School Shanghai Phase III |
Frame structure, Floor Area:10,245 sqm
Starting Date: August 2006
Completion Date: June 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Heinz Longfong Food (Chengdu) Plant |
RC structure/Steel structure, Floor Area:15,000 sqm
Starting Date: August 2006
Completion Date: May 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| CSA Works of Rhodia WRAP Project |
RC structure/Steel structure, Floor Area:28,000 sqm
Starting Date: April 2006
Completion Date: May 2007 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| USA. G.M. Food (Shanghai) Plant |
RC structure/Steel structure, Floor Area:21,989 sqm
Starting Date: February 2006
Completion Date: October 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Accuride International Precision Industrial (Suzhou) Plant |
RC structure/Steel structure, Floor Area:23,000 sqm
Starting Date: February 2006
Completion Date: August 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Optibelt Power Transmission (Taicang) Plant |
Steel structure, Floor Area:11,800 sqm
Starting Date: December 2005
Completion Date: August 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| AKG New Plant, Taicang, Phase 2 |
Steel structure, Floor Area:5,000 sqm
Starting Date: August 2005
Completion Date: March 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Yageo Electronics (Suzhou) Plant II |
Frame structure, Floor Area:36,000 sqm
Starting Date: June 2005
Completion Date: December 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| HITACHI Cable (Suzhou) Plant
|
Frame structure, Floor Area:7,800 sqm
Starting Date: May 2005
Completion Date: November 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Plantronics Suzhou Project |
RC structure/Steel structure, Floor Area:21,550 sqm
Starting Date: February 2005
Completion Date: March 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Suzhou Chuo Malleable (Suzhou) Plant |
Frame structure/Light Steel structure, Floor Area:13,138 sqm
Starting Date: December 2004
Completion Date: June 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Walton Suzhou S2 Plant Turnkey Project |
Steel structure/RC structure, Floor Area:36,572 sqm
Starting Date: November 2004
Completion Date: March 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Block 19, Apartment Wanli |
Frame structure£¬ Floor Area:120,000 sqm
Starting Date: October 2004
Completion Date: September 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| BlueScope Steel (Suzhou) Co., Ltd. China Coating Project
|
Steel structure/RC structure, Floor Area:6,328 sqm
Starting Date: October 2004
Completion Date: June 2006 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Concordia International School Shanghai Phase II |
Frame structure, Floor Area:15,068 sqm
Starting Date: October 2004
Completion Date: October 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Kangchen Logistic Center Warehouse (Suzhou) Phase I |
Steel structure/Frame structure, Floor Area:93,000 sqm
Starting Date: September 2004
Completion Date: February 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Eagle Ottawa China Ltd., Xin Zhuang Facility |
Steel structure, Floor Area:10,526 sqm
Starting Date: August 2004
Completion Date: February 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| USA. 3M Technology (SuZhou) Plant |
Steel structure, Floor Area:15,000 sqm
Starting Date: July 2004
Completion Date: March 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| USA. Wanvog Furniture (KunShan) Plant, Phase II
|
RC structure/Steel structure, Floor Area:55,130 sqm
Starting Date: June 2004
Completion Date: December 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Sew (Suzhou) Expansion Plant |
Steel structure, Floor Area:8,200 sqm
Starting Date: May 2004
Completion Date: September 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| USA. Wanvog Furniture (KunShan) Plant, Phase I
|
RC structure/Steel structure, Floor Area:39,870 sqm
Starting Date: December 2003
Completion Date: June 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Nippon Metal Manufacture (Suzhou) Plant |
RC structure/Steel structure, Floor Area:10,000 sqm
Starting Date: November 2003
Completion Date: June 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shimizu Corporation (Suzhou) Project
|
Steel structure/RC structure, Floor Area:24,000 sqm
Starting Date: November 2003
Completion Date: May 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| YKKAP Factory Project (Phase One) |
RC structure/Steel structure, Floor Area:49,128 sqm
Starting Date: August 2003
Completion Date: February 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shanghai PuDong Shangri-la Hotel (Phase 2) Above Ground Structure |
Frame structure£¬ Floor Area:50,000 sqm
Starting Date: July 2003
Completion Date: February 2005 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Maxtor SuZhou) Technology Plant
|
Frame structure, Floor Area:88,215 sqm
Starting Date: May 2003
Completion Date: February 2004 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| HITACHI Display Su Zhou Plant |
Frame structure, Floor Area:28,190 sqm
Starting Date: December 2002
Completion Date: September 2003 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Nanjing Accurate Electronic Parts Plant |
Steel structure/RC structure, Floor Area:4,300 sqm
Starting Date: August 2002
Completion Date: December 2002 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| O¡¯real Cosmetic (Suzhou) Factory |
Rebuilding Project,Steel structure, Floor Area:4,400 sqm
Starting Date: January 2002
Completion Date: April 2003 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| American Nabisco Food Suzhou Plant |
Steel structure/RC structure, Floor Area:13,000 sqm
Starting Date: December 2001
Completion Date: March 2002 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Rich Products Su Zhou Plant |
Steel structure, Floor Area:4,200 sqm
Starting Date: April 2001
Completion Date: September 2001 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Bosch Automotive Product (Suzhou) Factory |
Steel structure/Frame structure, Floor Area:21,400 sqm
Starting Date: March 2001
Completion Date: December 2001 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Meilong Town, Phase 1 |
RC structure£¬ Floor Area:85,840 sqm
Starting Date: February 2000
Completion Date: February 2001 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| General Mill Food (Nanjing) Plant |
Steel structure, Floor Area:6,140 sqm
Starting Date: March 1999
Completion Date: November 1999 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shanghai Mingshi Garden |
Frame structure£¬ Floor Area:57,878 sqm
Starting Date: June 1998
Completion Date: May 1999 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Kerry Commercial Center |
Frame structure£¬ Floor Area:81,986 sqm
Starting Date: July 1996
Completion Date: September 1998 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Shanghai International Garden |
Frame structure£¬ Floor Area:25,127 sqm
Starting Date: March 1994
Completion Date: September 1995 |
|
|
|
 |
|
 |
|
|
|
|
 |
|
 |
| |
|
| Altez Residence |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
60,000 sqm |
| Structure: |
62F |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| The Interlace |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
170,000 sqm |
| Structure: |
24F+1F Basement£¬ 1040 units |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Meyer Apartment |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
60,000 sqm |
| Structure: |
24F+1F Basement,1040 units |
| Construction duration: |
October 2008 - September 2009 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Reflection at Keppel Bay Residence |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
200,000 sqm |
| Structure: |
41F+2F Basement |
| Construction duration: |
July 2008 - July 2010 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Ocean Financial Center |
| General contractor: |
Obayashi Corporation & Woh Hup Pte Ltd
|
| Floor Area: |
100,000 sqm |
| Structure: |
43F |
| Construction duration: |
May 2008 - May 2010 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Straits Office Building |
| General contractor: |
Obayashi Corporation |
| Floor Area: |
30,000 sqm |
| Structure: |
28F |
| Construction duration: |
March 2008 - June 2009 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Orange Grove |
| General contractor: |
KSH Holdings |
| Floor Area: |
130,000 sqm |
| Structure: |
12F+1F Basement,72 units |
| Construction duration: |
January 2008 - December 2008 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Tate Apartment |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
30,000 sqm |
| Structure: |
36F+1F Basement |
| Construction duration: |
December 2007 - July 2009 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Mi Casa Residence |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
60,000 sqm |
| Structure: |
7 buildings£¬17F£¬457 units |
| Construction duration: |
December 2007 - December 2008 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
|
| Commerce & Finance Center |
| General contractor: |
Woh Hup Pte Ltd & Kajima Overseas Asia Pte Ltd
|
| Floor Area: |
70,000 sqm/150,000 sqm |
| Structure: |
55F/51F |
| Construction duration: |
July 2007 - November 2009/May 2008 - March 2010 |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| City Square Shopping Center |
| General contractor: |
Kajima Overseas Asia Pte Ltd |
| Floor Area: |
70,000 sqm |
| Structure: |
9F |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Apartment and Jurong Shopping Center Phase II |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
250,000 sqm |
| Structure: |
16F+4F Basement |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Yaleju Apartment |
| General contractor: |
Woh Hup (Private) Ltd |
| Floor Area: |
100,000 sqm |
| Structure: |
30F+3F Basement |
|
|
|
|
 |
|
 |
|
|
 |
|
 |
| |
 |
| Cappella Hotel |
| General contractor: |
Singapore Greatwall Co., Ltd. |
| Floor Area: |
70,000 sqm |
| Structure: |
6F+1F Basement |
|
|
|
|
 |
|
 |
|
| |